Mar 18, 2020
Racking for New 62,000 sq ft Warehouse – Case Study Our client, based in Bolton, sells sanitaryware and shower enclosures. Unfortunately, due to a fire at their previous warehouse they had to relocate to a new location – a new 62,000 sqft warehouse...
Mar 18, 2020
Mezzanine Floor Aligning & Full Office Fit Out – Case Study The client, who is based in Bolton, tasked PASSHA with the installation of a mezzanine floor that aligned with the level of the existing first floor. In addition, we created an opening in the existing...
Mar 18, 2020
Two-Tier Mezzanine Floor – Case Study The client, based near Cambridge is a popular supplier of household furnishings. Having recently relocated to new premises which included a 50,000 sq ft warehouse and offices, they wanted a showroom to showcase their products to...
Jan 2, 2018
Reconfiguration of Warehouse – Case Study The client contacted us to reconfigure their warehouse facility because they required greater storage space and an optimised workspace for additional personnel. The scope of works was extensive, and included: Dismantling of...
Jan 2, 2018
Warehouse Renovation – Case Study The client is one of the largest packaging material products and services distributors in the UK, with over 20,000 B2B customers. Project Overview After the client relocated to a new warehouse within Glasgow, they needed to renovate...