Adare International

Reconfiguration of warehouse facility

Adare International contacted us to reconfigure their warehouse facility because they required greater storage space and an optimised workspace for additional personnel.

  • The scope of works was extensive, and included:
  • Dismantling of the existing mezzanine floor entire
  • Closing-down the pallet racking aisles to accommodate ‘Bendi’ fork-lift trucks
  • Replacing of inadequate lighting with a new, energy-efficient lighting scheme.
  • Painting the production floor – approximately 1200 metres squared
  • Extending the existing goods in office.
  • Sourcing and installing: new partitions, power, data, ceiling, and carpet
  • Bespoke decoration

Adare’s existing configuration of roller shutter doors would not work with the new upgrade. As a result Passha created a new goods-out doorway, entailing the:

  • Extension to the existing canopy
  • Construction of a new ramp into the building
  • Creation of a new opening into the warehouse
  • Installation of a new sectional overhead door
  • Cladding of the doorway surround
  • Construction of new brick piers to complement the existing aesthetic

The end result was a better use of space, extra capacity and a safe workforce.

For help, advice and quotes call: 01788 247074 or email: sales@passha.co.uk (1 hour response)